Delivering Flexible Scaffolding for High-Rise Construction in Colombia
In response to increasing demand for urban housing in Colombia, we provided a complete scaffolding solution for a high-rise construction project. This complex development required a system that could adapt to varying elevation levels and facilitate safe worker access across all floor heights. Our modular steel scaffolding was an ideal choice for this demanding environment.
The client was undertaking the construction of multiple high-rise residential towers. Each structure required a flexible yet sturdy scaffolding setup to support exterior wall finishing, window installation, and roofing. Our solution provided a balance of performance, safety, and ease of use.
Adaptability in High-Rise Conditions
High-rise projects often face unique challenges such as wind load, vertical transportation of materials, and limited working space. Our scaffolding system’s high vertical load capacity, stable locking mechanisms, and compatibility with hoisting devices made it especially suitable for such environments.
The adjustable frame structure enabled the contractor to reconfigure scaffolding as the building progressed upward, minimizing downtime and improving productivity. Scaffolding was installed around elevator cores, staircases, and along exterior facades.
Shipping and On-Site Assembly
We packaged and shipped three full containers of scaffolding and accessories securely to Colombia.. Upon arrival, our technical support team assisted remotely with assembly guidance to ensure proper installation in compliance with safety protocols.
The system included base jacks, steel decks, ledgers, diagonal braces, and anti-fall guardrails. All components were hot-dip galvanized for long-term durability in the humid tropical climate.


Scaffolding
Improved Site Safety and Construction Efficiency
Construction managers reported improved safety due to the anti-slip platform design, integrated toe boards, and non-welding assembly. The scaffold system significantly reduced the need for additional tools or welding work, which helped reduce risk on site.
The scaffolding enabled teams to work simultaneously on different elevations, increasing efficiency and helping to meet a tight construction schedule. The modular nature of the system also allowed for quick relocation between towers on the same project site.
If you want to visit this project on site, or contact our client to check the machine’s work performance, please contact us: Email:sales@hamacchina.com WhatsApp:+8615136236223